Version 11 New Features: SoftList
| SoftPlan has changed deck support beams so they are now definable just like normal walls and beams are. This change is also carried through to SoftList. Now, when a formula is based on Group: Wall, Component: Support Beam, you can now specify the materials used in the deck beam's definition to base the material on. This addition allows you to define several different deck beams and at the same time allow SoftList to differentiate between the different deck beams and cost them separately. Previous versions of SoftList only assumed a single definition for all deck beams and could not calculate for different construction methods. Now, in Version 11 you can define several deck beams, from single ply solid wood beams, to multiple-ply pressure treaded beams. |
|
| SoftPlan Version 11 will copy your large custom SoftList formulas for use in other locations correctly. In previous versions, some information was lost during the copy of larger formulas. The Copy of large custom formulas will retain all the variables used, and also allow for twice the amount of information as Version 10 did. |
|
| SoftPlan
Version 11 has introduced many new features to the SoftList module of
the program. Included in
these new features is the ability to count Scissor Trusses, as a
new constant for Scissor Trusses has been added to the program.
This allows the user to easily differentiate between Scissor
Trusses and all other types of trusses on the material list report.
Scissor Trusses will only count on the material report if
a properly drawn cathedral ceiling is placed in Ceiling mode of
the SoftPlan program.
|
|
|
Generating a SoftList material report, will now display the columns
with a width that you can pre-determine. As the contents of your material
list can vary, you often need to adjust the widths of your columns to
allow all the information to fit on the page and also make the report
appear neatly. The column width can be adjusted once the report is
generated; but now that you can re-set their widths, you will no longer
have to manually adjust them every time you create a report.
Not only does this save you time in producing your SoftList material report, but it also ensures a consistant appearance for each report generated. |
|
| SoftPlan Version 11 has added the ability to
link costs to Speed Notes that have been placed on a drawing.
Previously, only available to other library items such as Symbols
and Openings, the Speed Notes ID field will allow the
addition of ID numbers to any note that has been saved into a Speed
Note library.
This will allow items to be counted that would otherwise never be drawn on a drawing, but may be noted on a drawing. For Example, there may be a need for a smoke alarm for each bedroom within a house. Although the smoke alarm can be drawn as a symbol on the drawing and counted that way, it could also be counted through the use of an ID number. By simply assigning an ID number to all Bedroom Speed Notes in the Room Names library, a material can be set-up for smoke alarms. The material will check for the appropriate Speed Notes ID number and count a smoke alarm for each one it finds. |
|
| Version 11 has included several tracking
numbers and taxes to the SoftList Properties of the Configure Symbol
dialog. This new addition allows the user to more accurately count
and cost all Library based items including Speed Notes, Electrical,
Posts, Cabinets and Openings. Tracking numbers now include
Account, Order, Part and Item numbers. Tracking numbers also
include up to 3 different tax rates, which were previously only
available in material formulas.
It is no longer necessary to create a separate material formula for symbols to include these items as they are now directly available when configuring the symbol. You can also continue to modify SoftList properties of existing symbols as changes occur, which can be accessed by one of two ways. |
Method #1
Method #2
|
| In Version 11 SoftList has increased the
maximum number of allowable Material formulas within a Material
Definition from 1,000 to 1,500. This increase should aid in
allowing those users who's requirements for complete Material
listings exceeded the previous limit.
Material formulas are numbered along the left hand column of the Material Definition menu for easy reference. SoftList still allows for 10 different Material Definitions, each containing 1,500 different Material formulas. This adds up to a total of 15,000 different Materials in all! |
|
| Electrical has now been added as a new
Group in SoftList Version 11. This addition will allow
material formulas to be written that can link to Electrical Symbols
in a drawing, as has been possible with Symbols and Openings
in previous versions.
A custom material can be setup with the Group>Electrical to count the number of electrical outlets using a specific ID number. This new feature allows you to list a cost on the report separate from the actual outlets to account for the installation labor. There is also the ability to detect Electrical Symbols of different sizes to apply costs based on their sizes. |
|
| In the release of SoftPlan Version 11, many
new features and improvements have been made to the SoftList
module. Among these new features is the ability to add account
numbers with dashes from the Material Definition dialogue.
In previous versions you would have to go to each material's Setup
to achieve this.
This feature allows you quick access to insert these account numbers for use in exporting these materials. |
|
| SoftPlan Version 11 has improved the ability
to create page breaks in a generated SoftList Report when it is
printed. This will allow a report to have forced page breaks to
start selected headings in the report at the top of a page.
The modification is made in the SoftList set-up for the Listing Format. New Page is an Action that can be set to cause the generated report to print the next item following the New Page Action at the top of a new page. The page break will be marked on the saved report with "(Page)" when the report is viewed on-screen. |
|
| Version 11 SoftList has included another Tracking field to the current list of Tracking numbers available to all material formulas and symbol libraries. The item number can be used as another way to keep track of materials when exporting Material Estimates to other programs such as accounting software. The Item Number can be used to represent a materials SKU number, catalogue number or any such number required to identify the material in the other program. |
|
| In Version 11 under the Group Slab
Material Definition, a Slab Edge slab component has now been
added for SoftList purposes. This addition now allows the formula
to look at each individual edge of the slab since they can be specified
differently (different footing thickness for example). Because
this feature does not just look at the slab as a whole, more accurate
material reports can be created.
If a recess is specified for a slab edge, for the purposes of creating a shelf for example, then this recess will now be calculated for subtraction from the material list. When the Slab Edge component is on, there will be related selection limit variables of slab_recess_depth and slab_recess_width. As with all selection limits, these allow the ability to isolate even further and specify what and how material is to be counted. These features allow for more flexibility as to how this material will count and thus provide more accuracy. |
|
SoftPlan Systems,