When a cleanup is run, what determines where the floor system items, ring joist, sill plate
and sub floor will cleanup to?
The Cleanup will set these three items to align with the outside of the outermost bearing material
on the wall above; typically the stud. If however, it is desired to have them cleaned up to say the outside of the
sheathing, then through the wall definition menu, it would be necessary to modify the sheathing material to be
bearing.