SoftPlan Mononpoly House SoftPlan Home Design Software SoftPlan 2014 Upgrade Information
SoftPlan+ information

Back| Print

SoftPlan Frequently Asked Questions: SoftList

  1. How do I export a Material Report into Microsoft Excel?
  2. I set the Building Permit formula to Include = Yes and I get two Building Permits listing
  3. Can the Material Costing defaults be changed?
  4. How do I change SoftList so that my precuts list out as 92 5/8'?
  5. How do I copy a Material Definition file from one system to another?
  6. How do I generate a report so as to have my lumber list out to 2-foot increments?
  7. How can I have SoftList list my garage walls as having a pressure-treated bottom plate?
  8. How can I reset my Report Configurations to the way they were shipped?
  9. How do I know what sequence numbers are in use with SoftList?
  10. Can the waste factor be manually changed for individual items within SoftList?
  11. How do I turn off the logo on my SoftList material report?

Back| Print