SoftPlan Mononpoly House  SoftPlan Logo

 

Back |  Print

Quick Start Four Day Itinerary 

Four Day Itinerary (class meets for four days in 90 minute sessions): all times are central
Day One 8:45 – 9:00 sign-in
  • Basic Overview of Interface
  • Mouse, Keyboard and Menu Commands
  • Windows File and Drawing Management
  • Fundamentals of Drawing Walls
  • Adding, Editing Dimensions
  • In depth overview of Wall editing options
  • Customizing Dimension Settings
  • General Q&A of the above items

9:00 am – 10:30 am

Day Two

8:45 – 9:00 sign-in

  • Drawing Openings
  • Customization of Openings
  • Profile Mode
  • Drawing Symbols
  • Use of Drawing Tools
  • Drawing Stairs
  • Customization of Stairs
  • General Q&A of the above items

9:00 am -10:30 am

Day Three 8:45 – 9:00 sign-in
  • Review of Windows File and Drawing Management
  • Simple creation of Foundation / Crawl Space including global editing of heights, and wall types
  • Insertion of beams and support posts
  • Dimensioning
  • Introduction to Offsets (Vertical placement of objects)
  • SoftPlan Tools including Fillet, Snap
  • Floor Systems
  • General Q&A of the above items
9:00 am – 10:30 am
Day Four 8:45 – 9:00 sign-in
  • Room Mode
  • Ceiling Systems
  • Roofs
  • SoftView Elevations
  • SoftView Cross Sections
  • Saving and Detailing Elevations
  • Saving and Detailing Cross Sections
  • General Q&A of the above items
9:00 am – 10:30 am

Back |  Print