SoftPlan Mononpoly House SoftPlan Home Design Software SoftPlan 2014 Upgrade Information
SoftPlan+ information

Back| Print

Elevation has generated with the second floor beneath the main floor?

The Assemble Floors list needs to be reset so that when the plans are assembled, the main floor is added first/lowest into the assembly, followed by the second floor plan. Always build the assembly working from the lowest plan to uppermost plan.

Back| Print